Trinity Road




Project Description
• Residential sprinkler system connected to the boosted cold water supply.
• Designed and installed to BS9251:2021.
• Materials used – CPVC and Steel pipe and fittings.
• Concealed and exposed sprinkler heads.
• Valve set per floor was installed
Case Details
- Client
- Hill Group
- Area
- Block A, B & C
- Blocks
- 3
- Apartments
- 104