Bargate




Project Description
- Residential sprinkler system connected to the boosted cold water supply.
- Designed and installed to BS9251:2021.
- Materials used – CPVC pipe and fittings.
- Concealed sprinkler heads.
- Valve set per floor was installed.
- Dry-riser installed in each block
Case Details
- Client
- ArkME
- Area
- Block A, BC, E & DFG
- Blocks
- 4
- Apartments
- 519